Kermorvan lighthouse - completed
1January 29, 2022First 20 parts of thick carboard glued together (base and stairs sidewals).
2January 29, 2022
3January 30, 2022This time I plan a rotating white light. Because the mechanical rotation is to complicated I intend to use this time too my CMOS best friend 4017. I will use 10 white SMD LED’s mounted in a circle. 10 capacitor and 10 additional resistors helps to simulate soft change between the LED’s for better simulation of a rotating beacon.
4January 30, 2022LED-array completed. About 12 mm in diameter.
5January 30, 2022LED’s CA glued to a piece of 0,8 mm thick plastic (“carrier”).
6January 30, 2022
7January 31, 2022First round with H165 and slightly lighter mix (H165 and H196) for the edges and around the openings. The original is more middle gray than the picture of the kit-artwork (completed Model).
8January 31, 2022Snow white is definitely the wrong color for a lighthouse. A mix of H130 and H196 is the better choice 🙂.
9January 31, 2022Second round with red and brown accents.
10February 2, 2022Third round with light gray for the edges.
11February 2, 2022
12February 2, 2022
13February 3, 2022Outer glass (second thin PVC as upgrade in contrast to the kit) not yet in place.
14February 3, 2022Inner windows (cardboard framing + thin PVC) in place.
15February 3, 2022
16February 5, 2022Slowly things take shape…🙂
17February 5, 20224 outer walls (thin cartboard) in place. Edges sanded with 320 grit paper smooth. Any imperfections fixed with off white and light grey.
18February 5, 2022The stairs consists of 9 steps. Each step consists of 3 parts because of the needed thickness.
19February 5, 2022Completed stairs.
20February 9, 2022
21February 9, 2022
22February 9, 2022
23February 9, 2022
24February 9, 2022
25February 10, 2022Gaps between wall and rock filled with „wood-putty“. Sanded smooth and engraved the stone structure. First step of painting for the rock completed.
26February 10, 2022
27February 10, 2022
28February 10, 2022
29February 10, 2022
30February 12, 2022Base completed.
31February 12, 2022
32February 12, 2022
33February 12, 2022
34February 13, 2022In comparison with Bunthäuser Spitze Kermorvan it’s a true giant!
35February 13, 2022
36February 19, 2022Electronic for the rotating beacon.
37February 19, 2022It works!🙂…
38February 19, 2022
39February 19, 2022…and it fits into the main part of the lighthouse🙂
40February 24, 2022Upper deck is now completed. It’s hard to believe that this finished assembly consists 175 parts!!
41February 24, 2022
42February 24, 2022
43February 27, 2022The most complicated and difficult to build part of the Kermorvan lighthouse: the lamphousing and cupola.
44February 27, 2022
45March 2, 2022
46March 2, 2022Nearly completed….
47March 2, 2022
48March 2, 2022Fiat Lux!!
49March 2, 2022
50March 5, 2022
51March 5, 2022
52March 5, 2022
53March 5, 2022
54March 5, 2022
55March 5, 2022
56March 5, 2022
57March 5, 2022
58March 5, 2022
59March 5, 2022
60March 5, 2022
61March 5, 2022
62March 5, 2022