RAF Red Arrows Hawk 50 Display Seasons
1December 13, 2019Let's dig into the kit, shall we? 🙂
2December 13, 2019basic cockpit, no extra PE or resin will be used since the cockpit will be closed
3December 13, 2019Cockpit assembled, painted and glued in the left half of the fuselage.
4December 13, 2019Mr. Designated driver in the kit was replaced with another (smaller one) from other kit. The original guy did not fit properly with the canopy closed.
5December 13, 2019Fuselage glued together and drying happily
6December 13, 2019
7December 13, 2019this thing (can not remember the correct terminus technicus for it) was easy work. "trench" is molded into the glass so only small amount of white wash was needed to show this nicely.
8December 13, 2019
9December 13, 2019Canopy glued with PVA glue in place
10December 13, 2019
11December 13, 2019
12December 13, 2019Wings are on! and the rest of the small bits are ready to go as well.
13December 13, 2019MRP red color finally arrived, so I can start working on the side intakes
14December 13, 2019Both intakes are drying below the plane
15December 13, 2019In the mean time the joints between the fuselage and the wings were filled with perfect plastic putty
16December 22, 2019coat of Mr. surfacer 1200; then coat of MRP white and at the end several thin layers of MRP 184 Signal red
17December 22, 2019without further glossing - surface is nice and shiny
18December 22, 2019
19December 22, 2019decalling in progress.
20December 22, 2019
21December 22, 2019
22December 22, 2019a little touch up with blue and white tamiya colors and the tail will be nice and tidy
23December 22, 2019and front nose also will need some white tamiya color touch up
24December 22, 2019looking really nice so far 🙂
25January 8, 2020Bottom white arrow painted instead of placing decal (which would be quite a challenge)
26January 8, 2020Everything is nicely glossed with MRP 2k laquer and all remaining parts added (front pitote tube, both antennas and front glass part)
27January 8, 2020and the kit is DONE! 🙂
28January 8, 2020
29January 8, 2020
30January 8, 2020
31January 8, 2020All that is left is the display base - coming soon 😉
32January 8, 2020
33January 12, 2020Display base is done!
34January 12, 2020
35January 12, 2020