Douglas SBD-1 Dauntless, USMC 2-MB-13
1October 29, 2021
2October 29, 2021Correct diameter but too deep….🙁
3October 29, 2021
4November 5, 2021Correct diameter and correct depth🙂
5November 5, 20211,5 mm brass tube glued into 2 of 6 holes on the front of the motor. 2. Attempt fits.
6November 5, 2021
7November 5, 2021Brass tubes glued with CA to the front of the fuselage.
8November 6, 2021Engine from the kit. I found the pushrods and ignition wires too massive and removed them. New pushrods of 0.6 mm round rod in place. Wires coming at next.
9November 6, 2021
10November 6, 2021
11November 7, 2021
12November 7, 2021
13November 8, 20211,5 mm brass tube as connector for power supply (3 V DC)
14November 13, 2021Its easier to fit the flaps to the wing before installing the wing to the fuselage.
15November 13, 2021
16November 18, 2021Very good fit.
17November 18, 2021
18November 18, 2021
19November 18, 2021Connection cables successfully soldered.
20November 18, 2021Connection points for inflight configuration and voltage supply for the motor.
21November 18, 2021
22November 20, 2021LSO light (red, green, amber). 1st step: cut out cleaned, rear plate added (0,13 mm plastic), 3 lights (punched with 0,8 mm flattened needle) from colored self adhesive foil.
23November 20, 2021Step 2: transparent cover made of narrow strip of Tesa tape.
24November 20, 2021Step 3: masked with an externally cutted mask (Tamiya tape).
25November 21, 2021Green is a mix of H131 and H2.
26November 21, 2021
27November 21, 2021
28November 28, 2021
29November 28, 2021
30November 28, 2021
31November 28, 2021
32November 29, 2021The result of a good modeling day🙂
33November 29, 2021
34November 29, 2021
35November 30, 2021Last airbrush session: dark grey as antiglare panel.
36November 30, 2021Unfortunately red and yellow are in the wrong place 🙁 so I had to fix them.
37November 30, 2021
38December 5, 2021On course again: yellow stripe is now correct in the middle.
39December 5, 2021
40December 5, 2021For in flight configuration you don’t need the landing legs.
41December 22, 2021Ground plate 1 (left): 40 mm Bambus & printed Dibond sandwich plate.
42December 22, 2021Ground plate 2 (right): 40 mm Bambus & printed Dibond sandwich plate.
43December 22, 2021Both ground plates together.
44December 22, 2021Rear panel 1 (left): printed Dibond sandwich plate & 12 mm birch wood Mux plate 250x50 mm
45December 22, 2021Both rear panels together.
46December 22, 2021
47December 22, 2021Both displays together minus attachments for the SBD’s (2-MB-13 and Hanno’s 2-MB-1) and batteries.
48December 22, 2021
49December 22, 2021
50December 22, 2021
51January 10, 2022Result of the group build: both planes of the VMB-2 together… (right flies the squadron leader, Hanno’s MB-1🙂)
52December 22, 2021
53January 10, 2022
54January 10, 2022
55January 10, 2022
56January 10, 2022
57January 10, 2022
58January 10, 2022
59January 10, 2022
60January 10, 2022
61January 10, 2022
Comments
6 June 2026, 14:41 -
Project info
Group Build

Scalemates Douglas SBD Dauntless Groupbuild
1. November 2021 until 30. June 2022
1. November 2021 until 30. June 2022
paper modeling database | stash manager


