Battleship Bismarck construction report.
1April 7, 2022The beginning has been made.
2April 7, 2022Let the etching orgy begin.
3April 7, 2022Wooden deck of Pontos. Painted aircraft identification.
4April 7, 2022First structures glued.
5April 7, 2022Fan after fan
6April 7, 2022The front deckhouse is refined with Styrene profiles.
7April 7, 2022The bridge will also be upgraded.
8April 7, 2022Better, out of box the bridge is very naked.
9April 7, 2022The Fire Control Set from Veteran Models is perfect.
10May 22, 2022Still improved the wobbly pots
11May 22, 2022Next floor is being prepared
12April 7, 2022First sailors on deck.
13April 7, 2022There are complaints... 🙂
14May 23, 2022Styrene profiles and lead wire are also installed on the tower
15April 7, 2022It grows
16April 7, 2022Veteran Models
17April 7, 2022Veteran Models
18April 7, 2022Handkerchief and wood glue...
19April 7, 2022The paravan is ready
20April 7, 2022Pontos' skylights are bursting with detail
21April 7, 2022Gangway brackets scratched
22April 7, 2022Admirals Brücke verbaut
23April 7, 2022Fits
24May 22, 2022Continue to the funnel
25April 7, 2022Here too, profiles and lead wire are used.
26May 22, 2022Crown placed and mounted on deck
27April 7, 2022Final details on the hull
28April 7, 2022First hangar
29April 7, 2022The dinghies are also awesome from Pontos. Scratched with a little detail added.
30April 7, 2022Front hangars finished
31April 7, 2022Reached the top of the tower
32April 7, 2022The foremast is also standing.
33April 7, 2022Catapult upgraded by Pontos
34April 7, 2022It's starting to look similar to the original
35April 8, 2022Now you can already see the typical Bismarck silhouette.
I think I'll really finish the model this year.
36April 9, 2022We continue with the rear deckhouse. Here, too, a lot of scratching has to be done.
37April 26, 2022The first traffic boat has taken place
38April 27, 2022Now colored handkerchief is used again. These will be the canvas covers for the signal flags.
39April 27, 2022I think the covers are impressive. But it will still take hours to get them all connected to the signal platform.
40April 27, 2022All covers in place.
41April 28, 2022I solved the attachment points for the many ropes with ladders that were cut in half. Once I've secured it, I bend the ladder rung down.
Unnecessary sprouts are then removed.
42April 28, 2022The signal platform has come into position
43May 8, 2022All lines on the signal platform are pulled.
44May 12, 2022And the famous paper handkerchief is used again
45May 12, 2022The tarpaulin is ready.
46May 16, 2022The deckhouse is now quite far and has a break for now. I'll now take care of the rear 38's and the last cable rolls.
47May 21, 2022Now all 38's are finished.
48June 2, 2022The Arado is also ready and can go into the hangar.
49June 2, 2022No sooner said than done.
The plane is pushed into the hangar on the rail system. Or out. I won't know until I've finished the team.
50June 6, 2022The crew is on deck and pushes the bird out of the hangar under supervision. Final adjustments have to be made to the jacks with the hammer. 😉
51June 18, 2022The front 10.5's are also in place
52June 18, 2022And of course the next level of railings.
53June 19, 2022We continue with the bridge wing. It's fantastic how many parts Pontos made this out of.
54June 19, 2022You can hardly get any closer to the original
55June 23, 2022Bridge wing is also installed.
56June 23, 2022Now the front 15' towers are being completed
57June 24, 2022On to the middle towers.
58July 3, 2022I still had to make corrections to the bridge wing because Pontos had forgotten something here. This sheet was used to close the bridge wing.
And when extended, like mine here, it of course prevented the sailors from falling. 😉
59July 3, 2022And with that we go back to the rear deckhouse. First fill it with life a little
60July 3, 2022And the main mast is now complete.
61July 4, 2022Today I glued the last large section onto the hull, the rear deckhouse.
Now all that's left is the small stuff.
62July 5, 2022And finally the mizzen mast was set and rigged.
63July 10, 2022While mounting the 37mm double flack, I noticed that Pontos had once again messed up with their research. The ladder to get to the rear deckhouse is missing.
64July 10, 2022The railing was cut up and a ladder was fumbled in.
65July 20, 2022The last 10.5 cm guns have also found their place.
66July 23, 2022So that the threads run parallel, I built a kind of scale.
67July 23, 2022And so the two long-wave antennas are on the mast.
68July 24, 2022That was nerve-wracking.
69July 25, 2022Now we'll make a stop while rigging. Now I equip the chimney gallery with searchlights and anti-aircraft guns.
70July 28, 2022The last two searchlights are in the gallery. Insane wealth of detail from veteran models.
71August 3, 2022Finally the armament is complete.
72August 3, 2022The last thing that came onto the ship was the 20mm anti-aircraft gun.
73August 3, 2022Now it's the turn of the cranes and a bit of rigging.
74August 5, 2022To the crane. First I scratched two cable drums. OOB just naked role.
75August 5, 2022The crane body is already finished and there are still endless components.
76August 5, 2022All components sanded and ready for painting.
77August 9, 2022Both cranes are now in place. It took a lot of nerve to pull the strings again.
78August 9, 2022Of course, a little scratch work was also a must. The lamp and crossbar so that the ropes do not hit were retrofitted.
79August 10, 2022And the rigging is checked off too.
80August 19, 2022One last little update before I go on vacation. The rear dinghies that were still on deck in April 41 are also attached.
81September 2, 2022After my vacation I finally made a little progress again. The last dinghies in the davits have come onto deck. A PE set from a destroyer in 1/350 had to be used for the rope drums.
82September 12, 2022Let's breathe some life into the model.
83September 12, 2022First made 20 sailors for amidships.
84September 12, 2022You meet each other.
85September 12, 2022Or get in trouble. 😉
86September 17, 2022The bow got its railing. It was really tricky around the anchor. And another sailor in action!
87September 18, 2022The cleaning crew to scrub the deck is also on board
88October 4, 2022Today the last group of sailors comes on the ship.
89October 4, 2022Another photo...
90October 4, 2022Distribute well...
91October 4, 2022And stood at attention...
92October 7, 2022Almost done.
93October 8, 2022Flag raised, it is done.
94October 9, 2022After 2 years and 4 months the project is finally finished. Reasonable photos follow.