1January 20, 202516 pieces 5 vavue formed sail and a decal sheet. classical heller kit from 1968 heller. lot of ejection pin to deal with with the masts.
2January 22, 2025I decided to maque the 3 openings of the access to the gouvernail + upper windows. not sure I will open the middle one yet.
3January 22, 2025the both side of the lower deck are not closied in most of the representation of Carrack / Nao of Colomb, therefore I opened it on both side. problem is now we need to create the prolongation of this deck 🙂))
4January 22, 2025same issue here opened I left the 2 pilar there in order to keep the uper deck attached to the lower one.
5January 22, 2025representation of the hull varies I chose to follow what was proposed in the kit openings on the lower and upper decks both side.
6January 24, 2025I am leaving in locked down city with no access to import no modelkit or hardware store. I have to do with what I have around me. so I did used carton board from packaging to represent the prolongation of the deck.
7January 24, 2025card board adjusted to the hull qith dry fit test.
8January 24, 2025
9January 24, 2025the model has a lot of ejection pin on the mast I did filled them.
10January 26, 2025
11January 26, 2025
12January 26, 2025
13January 26, 2025
14January 26, 2025
15January 26, 2025
16January 28, 2025
17January 28, 2025
18January 28, 2025
19January 28, 2025
20January 28, 2025
21February 1, 2025
22February 1, 2025
23February 1, 2025tried to put some relief but i think it is too way uniform and lighjt brown. see in the next pics from the latest replica.
24February 1, 2025
25February 1, 2025
26February 1, 2025
27February 2, 2025
28February 9, 2025assembling the hull. not an easy fit need some strength.
29February 9, 2025
30February 9, 2025dry fitting the last main element of the hull. again not easy to adjust. It is at the end not a big boat if compare it with the superglue...
31February 11, 2025building the 'castle' : 2 pilars in streched sprue to receive the floor made in a plastic card and painted and on its left the 'wall' cut in a yogourt pot (very flexible) to joint the deck and the castle.
32February 11, 2025wall glued in place.
33February 11, 2025added the floor and trimmed the wall.
34February 11, 2025The size and position of the castle look plausible compared to some reference (a lot of variation as there is no plan or representation of the santa Maria).
35February 11, 2025uge problem ! the opening is wide and the beam and the stairs are much more visible than I tought. they stop in the middle in between the 2 decks and it look odd. I need to do something about it or I redo the wall or I cut the beam.
36April 29, 2025
37April 29, 2025
38April 29, 2025
39April 29, 2025
40April 29, 2025used yogurt pot plastic to make the junction between the main deck and the foreward castle.
41May 1, 2025preparing the ramp of the foreward castle
42May 1, 2025positionning pilars and height
43May 1, 2025superglued a framing planking to receive the ramp
44May 1, 2025ramp in place.
45May 1, 2025first serie of pilar to consolidate
46May 1, 20252 sides down one to go.
47May 1, 2025
48May 1, 20253erd side finished.
49May 4, 2025
50May 4, 2025
51May 4, 2025
52May 4, 2025