CH-101 Merlin JMSDF #92
1September 26, 2019What I’m facing now is a lot of rebuilding because the differences between the HC3 and CH-101...
2September 26, 2019Template for 3 additional windows. In the middle the hole for glueing on the underground is well visible.
3September 26, 2019
4September 27, 2019
5September 28, 2019I hope so that the big bag is big enough...🙂
6September 28, 2019
7September 29, 2019Fuel filler caps „housings“ added. 2 flush in the kit vs 3 recessed in the original.
8September 30, 2019
9September 30, 2019Wiki commons: Mr. Hunini.
10October 3, 2019Reworked door - opening with reinforcement sheets. The small door on the left side is a two-piece swing type (like Seaking).
11October 3, 2019Raised rim around 2 windows (reinforcement-sheet) is made (airbrushed) of Mr color 500 Surfacer. Three of six attachment points for the antenna are in place.
12October 3, 2019Cooling gills for the gear opened. Further detalis coming soon.
13October 3, 2019Modified details here and there. 2.nd door sliding rail added. Rectangular piece top left is the foldable maintenance step (on the right fuselage side too).
14October 3, 2019Trapezoid shaped panel with 4 screws is the attachment point for fixing the outer blade when folded.
15October 4, 2019Air intakes: the fit is OK but it isn’t Tamiya and cleaning is required. I used for this task CA as filler and a small oval milling head. Left: middle intake not cleaned yet.
16October 4, 2019Modelers best friend: mini tool and different milling heads.
17October 11, 2019
18October 11, 2019
19October 11, 2019
20October 11, 2019
21October 11, 2019
22October 12, 2019
23October 15, 2019
24October 20, 2019I consulted the original pictures and found out that the Japanese SAR - Merlin’s has only 14-15 seats and that the seatframe have an different layout.
25October 20, 2019
26October 26, 2019
27October 26, 2019
28October 27, 2019
29October 27, 2019
30November 1, 2019JMSDF Merlin’s has a different screen layout (6 equal and rectangular) in comparison of the CH3 troop carrier
31November 1, 2019As usual I made switches of 0,25 mm wire, installed in holes without painting.
32November 1, 2019Unfortunately I confused the direction of the control sticks and so the layout of the 7 elements is off by 180 degrees (too late to fix this mistake🙁)
33November 1, 2019
34November 3, 2019
35November 4, 2019
36November 14, 2019Different service panel and air inlets added.
37November 14, 2019
38November 14, 2019
39November 14, 2019
40November 19, 2019JMSDF has a hinge for folding the tail.
41November 19, 2019
42November 24, 2019
43November 25, 2019Attachment point for the winch, bumper (fuselage) and cable holder.
44November 25, 2019Windows in place. They have different layout and function.
45November 25, 2019
46November 29, 2019
47December 10, 2019
48December 10, 2019
49December 10, 2019
50December 10, 2019
51December 10, 2019
52December 19, 2019
53December 19, 2019
54December 19, 2019
55December 19, 2019
56December 20, 2019
57December 20, 2019
58December 21, 2019
59December 21, 2019
60December 21, 2019
61December 21, 2019
62December 21, 2019
63December 22, 2019
64December 22, 2019
65December 25, 2019
66January 1, 2020
67January 1, 2020
68January 1, 2020
69January 1, 2020
70January 1, 2020
71January 3, 2020Small lower windows has black rim. For easier painting/masking I intend to paint the rim black before installation and install them after airbrushing the entire fuselage engine gray.
72January 3, 2020
73January 5, 2020
74January 5, 2020
75January 5, 2020
76January 5, 2020
77January 6, 2020All large decals in place. Stencils comming soon.
78January 6, 2020In most cases the decal carrier film is invisible.
79January 6, 2020
80January 6, 2020Despite semi matt surface no carrier film and 0,0% slivering: Mr Setter 232.
81January 6, 2020
82January 9, 2020
83January 9, 2020
84January 9, 2020
85January 11, 2020
86January 11, 2020
87January 11, 2020
88January 11, 2020
89January 13, 2020
90January 13, 2020
91January 13, 2020
92January 15, 2020
93January 15, 2020Steps and small details on lower half coming soon.
94January 16, 2020
95January 16, 2020
96January 18, 2020
97January 20, 2020
98January 20, 2020
99January 20, 2020
100January 20, 2020Very top part of the landing gear I cuttet of and installed from above (it was impossible to install the entire leg from the bottom).
101January 20, 2020
102January 20, 2020Antenna booms are made of soldered brass 0,7 mm tube and 0,4 mm cooper sheet. 0,48mm wire fits perfectly in the 0,7 mm (0,5mm) tube.
103January 20, 2020
104January 21, 2020
105January 21, 2020Anti skid mat made of airbrushed (unthinned paint and low pressure) decal.
106January 21, 2020
107January 22, 2020
108January 25, 2020
109January 25, 2020
110January 25, 2020
111January 26, 2020Winch housing and supports struts.
112January 26, 2020
113January 26, 2020
114January 26, 2020
115January 26, 2020
116January 27, 2020Winch hook.
117January 27, 2020
118January 27, 2020
119January 27, 2020
120January 28, 2020
121January 28, 2020
122January 30, 2020Reworked wippers.
123January 30, 2020Discharge cables for the fin.
124January 30, 2020
125January 30, 2020Door in place.
126February 1, 2020Mirrors and mirrors booms.
127February 2, 2020
128February 2, 2020
129February 2, 2020Mirror front covered with mirror-foil.
130February 2, 2020
131February 2, 2020Source: Wiki commons, Mr. Hunini
132February 2, 2020
133February 3, 2020Tail rotor completed minus cables (coming soon after airbrushing). ATRSQ: 45 parts.
134February 5, 2020Tail rotor completed: 90 parts.
135February 5, 2020
136February 5, 2020
137February 5, 2020
138February 5, 2020
139February 8, 2020Day 1: rotor head base plate. ARSQ: 73 parts.
140February 8, 2020Source: wiki commons.
141February 9, 2020Day 2: blade pitch links and dampers. Additional parts on the rotor head. ARSQ: 147 parts.
142February 10, 2020
143February 10, 2020
144February 12, 2020Day 3. Blades should be corrected because folding. ARSQ: 197 parts.
145February 13, 2020
146February 13, 2020Day 4. Blade-hinges printed of Shapeways reworked. ARSQ: 212 p.
147February 13, 2020New research results: Shapeways rotorhead-side of the hinge is too small🙁
148February 14, 2020Day 5: all 5 blades has correct „cuffs” / hinges. ARSQ: 222 p.
149February 14, 2020Wiki commons: Mr. Hunini.
150February 14, 2020Day 6: All 10 parts sanded at same time as one block.
151February 14, 2020Inner lips of the hinge (rotor head side). ARSQ: 232 p.
152February 15, 2020Day 7: Lockhousing and e-engine housing (3,5 mm rod). ARSQ: 247 p.
153February 16, 2020Not all has the same design.
154February 16, 2020
155February 16, 2020Day 8: compared with Seaking’s hydraulic rotor folding is the electric solution very clean and simple (fortunately for the modeler). ARSQ: 307 p.
156February 16, 2020
157February 19, 2020Day 11: light gray for topside and hinge.
158February 19, 2020Day 11: dark grey for lower side.
159February 19, 2020cleaning and repainting light gray
160February 20, 2020Day 12: leading edge in Metall. Mix of magnesium Metalizer, Sealer (Testors), few drops of Gunze Mr.metal gold and HU125
161February 20, 2020minor color corrections via brush.
162February 20, 2020Large screws painted dark grey metallic. Templates punched with 2,5 mm brass tube.
163February 20, 2020
164February 20, 2020
165February 20, 2020cables and screw security-wires in place. ARSQ: 347 p.
166February 21, 2020Day 13: decals on the lower side in place.
167February 22, 2020Day 14: the first hinge is completed. The first is always most time consuming. The remaning 4 will need less time.
168February 22, 2020
169February 22, 2020
170February 22, 2020Day 14: 1,1 mm brass tube as axis for the hinge. Installing AFTER gluing the halves together possible.
171February 22, 2020The blade will be installed via 0,8 mm brass rod after mounting all hinges. 🙂
172February 24, 2020Day 16: Outer lips on the hinge added (rotorhead side). 3 of 5 hinge housings completed. ARSQ: 407 p.
173February 24, 2020
174February 24, 2020
175February 26, 2020Day 18: all hinges are now at last completed! ARSQ: 457 p.
176February 28, 2020Day 20: painted and marked: white, yellow, black, red and blue.
177February 28, 2020All hinges in place in the correct sequence. Underside, the round “windows” are well visible.
178February 28, 2020View from the top. "Taumelscheibe" (swash plate) is all ready installed.
179February 28, 2020Vibration damper and blade pitch links in place: nearly completed.
180February 28, 2020
181February 28, 2020Cables in place = rotorhead completed. ARSQ: 487 p.
182February 29, 2020Day 21: completed.
183February 29, 2020
184February 29, 2020
185February 29, 2020
186February 29, 2020
187February 29, 2020
188February 29, 2020
189February 29, 2020
190February 29, 2020
191March 1, 2020
192February 29, 2020
193March 1, 2020
194February 29, 2020
195February 29, 2020
196February 29, 2020
197February 29, 2020
198February 29, 2020
199March 1, 2020
200March 1, 2020
201March 1, 2020
202March 1, 2020
203March 1, 2020
204March 1, 2020
205March 1, 2020
206March 1, 2020
207March 1, 2020
208March 1, 2020
209March 1, 2020
210March 1, 2020
211March 1, 2020
212March 1, 2020
213March 1, 2020
214March 1, 2020
Коментари
24 July 2026, 21:56 -
База података о моделовању папира | Менаџер залиха



